Field guide · PDF · 1 page
The 1-page Strata Quote Brief
A panel-ready reference an estimator can clip to a clipboard. Covers the 8 line items every strata committee expects, the NCC clauses to attach, a cover-letter opener, and a sign-off block in the title-block style.
- The 8 line items every panel reads first
- 3 NCC anchor clauses pre-attached
- Cover-letter opening paragraph (fillable)
- DRAWN / CHECKED / APPROVED title block
- 01 · Substrate prep - grind, vacuum, moisture-test
- 02 · Waterproofing membrane (AS 3740) + primer
- 03 · EPS render system - mesh + base + top
- 04 · Balustrade compliance (AS 1170.1 / 1428.1)
- 05 · Drain box + parapet flashing tie-in